Skip to content
BEATONCONSTRUCTION

Bathrooms

Bathroom renovations in Christchurch

Complete bathroom renovations, from strip-out to the final fit-off. One team runs the job, from the waterproofing under the tiles to the last fitting.

Long bathroom under a sloping ceiling with a freestanding bath, white subway tiles and a heated towel rail

What's included

What a bathroom renovation covers

  • Strip-out and repairs

    Old linings, fittings and flooring out, then any rotten framing or floor replaced before the new room goes in.

  • Waterproofing

    A membrane under tiled floors and showers, with the floor falling to the waste and every corner and pipe sealed.

  • Showers and baths

    Tiled walk-in showers, acrylic shower units, and freestanding or back-to-wall baths.

  • Vanities, tiles and fittings

    Wall-hung vanities, lit mirrors, heated towel rails, and tiling from the floor to a feature wall.

Process and timeline

How a bathroom renovation runs

Typical timeline

A standard bathroom usually takes two to four weeks once work starts. Moving walls, framing repairs and custom tiling add time.

  1. 01

    Plan the layout

    We measure up and talk through layout, fittings and budget. Keeping the toilet and shower where they are usually costs less than moving them.

  2. 02

    Quote and consent check

    A written quote listing fittings and tiles. Replacing fittings in the same place usually doesn't need consent; moving plumbing or walls can.

  3. 03

    Strip-out and rough-in

    The old bathroom comes out, framing is checked and repaired, and licensed plumbers and electricians run new pipes and wiring.

  4. 04

    Waterproof and tile

    The membrane goes on and cures, then tiles and grout.

  5. 05

    Fit-off

    Vanity, toilet, shower screen, towel rail, extractor fan and silicone, then a final clean.

Local knowledge

Bathrooms in Canterbury homes

  • Water stays out

    Water that gets past tiles rots floors and framing out of sight. A membrane under tiled floors and showers, with sealed corners and penetrations, stops it.

  • Ventilation

    Cold Canterbury winters mean cold walls and condensation. An extractor fan ducted outside clears steam and helps stop mould.

  • Licensed trades

    Plumbing, drainage and electrical work must be done by licensed tradespeople. They are booked at the right stage so the job keeps moving.

  • Older floors

    Bathrooms in older villas often sit on timber floors with rot around the shower or toilet. New flooring, and sometimes new joists, go in before the waterproofing.

Our work

Recent projects

Questions

Common questions

Another question? Call us on 027 960 3400.

How long does a bathroom renovation take?

Two to four weeks on site is usual for a standard bathroom. Membrane curing time, tile choice and any framing repairs affect the total.

Do I need consent to renovate my bathroom?

Replacing fittings in the same place usually doesn't need building consent. Moving the shower or toilet, adding a new bathroom or changing walls can. The quote states which applies, and your council can confirm.

Tiled shower or a shower unit?

An acrylic shower unit is quicker to install and costs less. A tiled walk-in shower takes longer because of the membrane and tiling, but it can be any size and finish.

Do you organise the plumber and electrician?

Yes. Plumbing and electrical work is done by licensed tradespeople, booked in at the right stage of the job.

Areas

Bathrooms across Canterbury

Council, ground and weather notes for each area we work in.

Get a quote for your bathroom

Call us on 027 960 3400 or send the details online. Quotes are free and written.

Call usGet a quote