Bathrooms
Bathroom renovations in Christchurch
Complete bathroom renovations, from strip-out to the final fit-off. One team runs the job, from the waterproofing under the tiles to the last fitting.

What's included
What a bathroom renovation covers
Strip-out and repairs
Old linings, fittings and flooring out, then any rotten framing or floor replaced before the new room goes in.
Waterproofing
A membrane under tiled floors and showers, with the floor falling to the waste and every corner and pipe sealed.
Showers and baths
Tiled walk-in showers, acrylic shower units, and freestanding or back-to-wall baths.
Vanities, tiles and fittings
Wall-hung vanities, lit mirrors, heated towel rails, and tiling from the floor to a feature wall.
Process and timeline
How a bathroom renovation runs
Typical timeline
A standard bathroom usually takes two to four weeks once work starts. Moving walls, framing repairs and custom tiling add time.
- 01
Plan the layout
We measure up and talk through layout, fittings and budget. Keeping the toilet and shower where they are usually costs less than moving them.
- 02
Quote and consent check
A written quote listing fittings and tiles. Replacing fittings in the same place usually doesn't need consent; moving plumbing or walls can.
- 03
Strip-out and rough-in
The old bathroom comes out, framing is checked and repaired, and licensed plumbers and electricians run new pipes and wiring.
- 04
Waterproof and tile
The membrane goes on and cures, then tiles and grout.
- 05
Fit-off
Vanity, toilet, shower screen, towel rail, extractor fan and silicone, then a final clean.
Local knowledge
Bathrooms in Canterbury homes
Water stays out
Water that gets past tiles rots floors and framing out of sight. A membrane under tiled floors and showers, with sealed corners and penetrations, stops it.
Ventilation
Cold Canterbury winters mean cold walls and condensation. An extractor fan ducted outside clears steam and helps stop mould.
Licensed trades
Plumbing, drainage and electrical work must be done by licensed tradespeople. They are booked at the right stage so the job keeps moving.
Older floors
Bathrooms in older villas often sit on timber floors with rot around the shower or toilet. New flooring, and sometimes new joists, go in before the waterproofing.
Our work
Recent projects
How long does a bathroom renovation take?
Two to four weeks on site is usual for a standard bathroom. Membrane curing time, tile choice and any framing repairs affect the total.
Do I need consent to renovate my bathroom?
Replacing fittings in the same place usually doesn't need building consent. Moving the shower or toilet, adding a new bathroom or changing walls can. The quote states which applies, and your council can confirm.
Tiled shower or a shower unit?
An acrylic shower unit is quicker to install and costs less. A tiled walk-in shower takes longer because of the membrane and tiling, but it can be any size and finish.
Do you organise the plumber and electrician?
Yes. Plumbing and electrical work is done by licensed tradespeople, booked in at the right stage of the job.
Areas
Bathrooms across Canterbury
Council, ground and weather notes for each area we work in.
Other services
Get a quote for your bathroom
Call us on 027 960 3400 or send the details online. Quotes are free and written.


